General Work Scope Inclusions 1.
Provide all supervision, labor, materials, tools, supplies, and equipment necessary to complete the work indicated herein and as directed by Graham site supervision.
Note :
- most of this building is being utilized as a Laboratory and needs to be cleaned to those standards. o Final Cleaning all rooms including, but not limited to : Wiping down all walls, doors, base boards Cleaning of all cabinetry Cleaning all floors o Interior and exterior glass surfaces and windowsills. o In areas without ceilings (106, 111, 112. 113, 202, 203, 209, 227, 228, 229, 230, 231, 232) wipe down all ductwork, piping, lights, etc. o Clean all restrooms.
- Including polishing of Stainless-steel partitions, cleaning mirrors, lockers, showers, etc. o Power wash the exterior of the building, including sidewalks o Final Cleaning shall be in accordance with Section 017700 of the Project Manual. 2.
- Daily cleanup of work and work area to dumpsters.
Dumpsters provided by others. Felons are encouraged to apply!
Powered by JazzHR