Overview
SpecPro Sustainment and Environmental, LLC is seeking a CADD Technical Support Lead to support our ongoing mission at Ft. Cavazos, TX.
Responsibilities
- Contractor shall perform tasks described below which are non-severable, and shall result in the development of a comprehensive Phase II Summary Report for the Fort Hood CADD Technical Support.
- The technical lead shall include : workload management and the management of personnel; lead the preparation of the CADD platform customization and enhancements to include future initiatives, including database integration; coordinate with individual department heads at Fort Hood and CADD end-users; and ensure that all work is high quality and that the appropriate QA / QC procedures are followed.
- Additionally the Contractor shall provide technical services to implement the overall departmental needs assessment, and will also work on specific prioritized end-user requests.
- The Contractor shall create and prepare maps, drawings, tables, and graphics for reports and other data products; collect and process data for Fort Hood; and maintain and update Fort Hood's CADD related databases using CADD software compatible with Bentley's Suite of products and other associated software. The Lead shall have five (5) years of CADD software experience comparable to Bentley's Suite.
- The contractor shall perform all updates and entries in GFEBS for DPW issued work requirements.
- The Contractor shall plan and coordinate the continued implementation of a CADD architecture that is database-enabled; manage day-to-day functions to ensure produced products meet stated DPW requirements, are technically correct, and are delivered on time. The Contractor shall coordinate with the DPW, Fort Hood Business Office, independent department heads, and end-users throughout the installation in executing workflow and prioritizing tasks. The Contractor shall also be responsible for developing and implementing quality control policies and procedures.
- Update Short and Long Range Plan for the Implementation of a Database-Enabled CADD System within Fort Hood, including planning, design, implementation, operation, and maintenance, identifying tasks, constraints, measures to overcome them, and providing a detailed timeline, milestones, objectives, and order-of-magnitude costs.
- The Contractor shall perform detailed engineering surveys of facilities and civil works projects by collecting and processing data for Fort Hood's CADD and other related databases. Data shall be collected using GPS survey-grade equipment (e.g., Trimble R10). Survey equipment and incidental components are considered "common tools of the trade" and will not be furnished by the government. Data shall be collected and delivered in a format compatible with modern drafting software and project needs. Up to 100 exterior and interior engineering projects totaling approximately 5,200 acres will be surveyed. Types of surveys include Topographic, Hydrographic, Static GPS Control, and Building Interior Surveys. Completed surveys shall be delivered to Fort Hood DPW Engineering Division in accordance with Fort Hood Surveying requirements and received within 14 calendar days of request.
- The Contractor shall operate, update, revise, and maintain Fort Hood's CADD related databases using Bentley Suite products and other compatible software. If CADD software requires updates, the contractor shall be trained to operate.
- The Contractor shall perform routine mapping, including the creation and preparation of drawings, tables, and graphics for reports and other data products. This includes developing standard processes for consistent drawing packages, providing customers with drawings and floor plans, and maintaining an inventory of flat maps; ensuring as-built drawings not provided in electronic format are scanned and included in the scans directory.
- The Contractor shall develop database applications within the Bentley Suite desktop environment, ensuring compatibility with other DPW software and extensions. The Contractor shall also develop custom web-based products.
- The Contractor shall provide monthly status reports documenting actions completed and ongoing work, pulled from GFEBS entries and sent to the KO.
About SpecPro
SpecPro Sustainment and Environmental, LLC is an environmental, energy, and facility services firm headquartered in San Antonio, TX. We are a subsidiary of Bristol Bay Native Corporation (BBNC). If you are interested in joining our team, please submit your resume, qualifications, and salary requirements.
Additional Information
All offers are contingent upon a thorough background check conducted on all final candidates, as deemed necessary and per State and Federal laws.
SpecPro Sustainment and Environmental, LLC offers a competitive benefits package to include paid holidays, paid time off including sick and vacation leave, medical, dental and vision insurance, flexible spending accounts, short and long term disability, company paid life insurance, 401(k) with a company match.
J-18808-Ljbffr