Title : BESS Project Engineer (Onsite)
Work authorization : any (candidate must be authorized to work in US)
Must-have skills : 7+ years of proven engineering experience; energy storage or battery storage (BESS, ESS)
PREFERRED : SME in substation or utility scale energy storage design and / or project management ,Lithium ion battery storage
5+ y exp. with BESS and PV Plant Control Code Library; exp. creating and maintaining documentation for engineering rationales behind all future changes to this BESS master
library
PREFERRED : Factory Acceptance Test (FAT)
Location : Juno Beach, FL
PLEASE SEND CANDIDATES registered and currently located in EST / CST time zone states.
Candidates from other locations won't be considered.
Client : NextEra Energy Resources
Rate : please send resumes of your consultants along with the minimum rate they will accept to take (and stay) on the job. The rate is OPEN.
Seniority on the skill / s required on this requirement : Sr.
Earliest Start Date : ASAP
Type : Temporary Project
Estimated Duration : 12 months with possible extension (s)
Additional information : The candidate should be able to provide an ID if the interview is requested. The candidate interviewing must be the same individual who will be assigned to work with our client.
Requirements :
Availability to work 100% of the time at the Client's site in Juno Beach, FL (required);
Experience with BESS (Battery Energy Storage Systems) and PV (Photovoltaic) Plant Controls : Strong understanding of these systems, including industry standards and best practices for code development.
- Automation and Process Controls experience, particularly in PLC and PLC programmer development, as well as DCS (Distributed Control Systems);
- Experience in systems such as : Ignition, Wonderware, iFIX;
Experience in overseeing change management practices to ensure the deployment of updated library code.
Experience with creating and maintaining comprehensive documentation for engineering rationales and updates related to the BESS and PV control code library.
Experience with Factory Acceptance Testing (FAT) processes to validate system operability before commissioning.
Experience in coordinating with system integrators and stakeholders to ensure alignment with best practices and successful implementation of control systems.
Preferred :
Experience in the utility or energy industry;
Responsibilities include but are not limited to the following :
Create, update, and manage the control code library for BESS and PV systems, incorporating industry best practices and lessons learned.
Produce detailed documentation that explains the rationale behind changes to the BESS master library, ensuring clarity for future modifications.
Manage change practices to ensure integrators have access to the latest code versions and adhere to updated protocols.
Assist in creating a Factory Acceptance Test template for BESS and PV assets to validate Plant Control functionality and readiness for commissioning.
Monitor code implementation to verify that it meets operational standards and incorporates feedback from lessons learned.
Work closely with system integrators, engineers, and project teams to ensure alignment and successful deployment of the control code library.
Regularly update the control code library with best practices, staying informed about new trends and technologies in BESS and PV systems.
You can see the list of our currently active job openings on our website : https : / / vitaver.com / jobs / .
Thank you for your interest in doing business with us.
Also, I'd like to remind you that as per the executed Letter of Intent , your company has certified the following below :
- The same Candidate that interviews with our Recruiters will be the one who needs to show up at the Client's site.
- The same resume submitted under his / her name will belong to that Candidate appearing in person.
- Resumes and Skill Matrixes will be completed fully and accurately and reflected in the resume consistently with verifiable work experience and credentials.
Resumes can't be edited or 'customized' to fit the job description.
- References will be of past supervisors at the client companies where you had placed your Candidate.
- If you want to submit candidates who are not currently your W2 employees, please ensure that you obtain their right-to-represent form prior to sending them to us.
We may request this form in the event of a conflict. Our experience shows that such candidates may ask to engage directly, claiming that they have no relationship with the vendor presenting them.
Any Candidate you submit to us, to the best of your knowledge, is ready to take the job, and remain on it for the duration of the project.
You will inform us immediately if a Candidate you submitted to us, is hired or in advanced negotiations to be hired by another Client, to limit the damage to our client and our relationship.
Please send your resumes to :
Email :
Title : BESS Project Engineer (Onsite)
Work authorization : any (candidate must be authorized to work in US)
Must-have skills : 7+ years of proven engineering experience; energy storage or battery storage (BESS, ESS)
PREFERRED : SME in substation or utility scale energy storage design and / or project management ,Lithium ion battery storage
5+ y exp. with BESS and PV Plant Control Code Library; exp. creating and maintaining documentation for engineering rationales behind all future changes to this BESS master
library
PREFERRED : Factory Acceptance Test (FAT)
Location : Juno Beach, FL
PLEASE SEND CANDIDATES registered and currently located in EST / CST time zone states.
Candidates from other locations won't be considered.
Client : NextEra Energy Resources
Rate : please send resumes of your consultants along with the minimum rate they will accept to take (and stay) on the job. The rate is OPEN.
Seniority on the skill / s required on this requirement : Sr.
Earliest Start Date : ASAP
Type : Temporary Project
Estimated Duration : 12 months with possible extension (s)
Additional information : The candidate should be able to provide an ID if the interview is requested. The candidate interviewing must be the same individual who will be assigned to work with our client.
Requirements :
Availability to work 100% of the time at the Client's site in Juno Beach, FL (required);
Experience with BESS (Battery Energy Storage Systems) and PV (Photovoltaic) Plant Controls : Strong understanding of these systems, including industry standards and best practices for code development.
- Automation and Process Controls experience, particularly in PLC and PLC programmer development, as well as DCS (Distributed Control Systems);
- Experience in systems such as : Ignition, Wonderware, iFIX;
Experience in overseeing change management practices to ensure the deployment of updated library code.
Experience with creating and maintaining comprehensive documentation for engineering rationales and updates related to the BESS and PV control code library.
Experience with Factory Acceptance Testing (FAT) processes to validate system operability before commissioning.
Experience in coordinating with system integrators and stakeholders to ensure alignment with best practices and successful implementation of control systems.
Preferred :
Experience in the utility or energy industry;
Responsibilities include but are not limited to the following :
Create, update, and manage the control code library for BESS and PV systems, incorporating industry best practices and lessons learned.
Produce detailed documentation that explains the rationale behind changes to the BESS master library, ensuring clarity for future modifications.
Manage change practices to ensure integrators have access to the latest code versions and adhere to updated protocols.
Assist in creating a Factory Acceptance Test template for BESS and PV assets to validate Plant Control functionality and readiness for commissioning.
Monitor code implementation to verify that it meets operational standards and incorporates feedback from lessons learned.
Work closely with system integrators, engineers, and project teams to ensure alignment and successful deployment of the control code library.
Regularly update the control code library with best practices, staying informed about new trends and technologies in BESS and PV systems.
Thank you for your interest in doing business with us.
Also, I'd like to remind you that as per the executed Letter of Intent , your company has certified the following below :
- The same Candidate that interviews with our Recruiters will be the one who needs to show up at the Client's site.
- The same resume submitted under his / her name will belong to that Candidate appearing in person.
- Resumes and Skill Matrixes will be completed fully and accurately and reflected in the resume consistently with verifiable work experience and credentials.
Resumes can't be edited or 'customized' to fit the job description.
- References will be of past supervisors at the client companies where you had placed your Candidate.
- If you want to submit candidates who are not currently your W2 employees, please ensure that you obtain their right-to-represent form prior to sending them to us.
We may request this form in the event of a conflict. Our experience shows that such candidates may ask to engage directly, claiming that they have no relationship with the vendor presenting them.
Any Candidate you submit to us, to the best of your knowledge, is ready to take the job, and remain on it for the duration of the project.
You will inform us immediately if a Candidate you submitted to us, is hired or in advanced negotiations to be hired by another Client, to limit the damage to our client and our relationship.
Please send your resumes to :
Email :